SCALABLE SITE SOLUTIONS

Modular accommodation Modular options should be considered for projects that exceed more than fifty people. These are typically Tier 1 projects that exceed a two-year operational period. Delivering a premium facility of this type requires intensive planning and the mobilisation supervisor will take full control of the process. They will be assigned to oversee all operational requirements, from the initial enquiry through to completion of the project. This provides a single point of contact for each site. Unit types A variety of configurations are available dependent on the number of personnel required to man the site. The example overleaf shows a typical configuration, however much larger offices can be constructed. A number of optional extras can also be chosen including smoking shelters and security huts. Please see page 43 for details.

The requirements for each site vary dependent on its operational requirements and they will be customised to reflect these needs. These requirements will be ascertained by site surveys, factoring in ground conditions, personnel requirements, location and available space. Key time points The mobilisation point for this type of site is twenty six weeks from operational start date. TSS expects the site set-up to be achieved by week -1. Demobilisation activities must allow twelve weeks for major, eight for large, six for medium and five for small projects respectively. This ensures the most cost effective close down of site and allows for the strategic use of logistics in removal.

26

Total Site Solutions | www.murphygroup.co.uk

Made with FlippingBook - Online catalogs